Industrial Heat Tracing Installation Worldwide

Our Installation Teams Worldwide

Pro Therm installs industrial electric heat tracing in Germany and on international project sites. Our own specialist teams connect engineering with field execution, from heating cables on pipes and vessels to connections, testing and documentation.

Projektbild / Project image
Bildplatzhalter

Item Title

This is placeholder text. To connect this element to content from your collection, select the element and click Connect to Data.

Mehr erfahren

Item Title

This is placeholder text. To connect this element to content from your collection, select the element and click Connect to Data.

Read More

Item Title

This is placeholder text. To connect this element to content from your collection, select the element and click Connect to Data.

Read More

Our own installation teams

Worldwide installation is a core part of our heat tracing offering. Using our own teams keeps communication between engineering, project management and the construction site short and practical. Field feedback can be incorporated into documentation and future design decisions.

International industrial projects

We support plant owners, EPC contractors, engineering companies and industrial construction teams in Germany, Europe and worldwide. Mobilization, site organization and documentation are defined for the individual project. Planning an international site assignment calls for information about construction phases, installation windows, access, site safety requirements and interfaces with piping, electrical work and insulation. This allows materials, circuits and checks to be coordinated with the actual construction schedule.

What we install

Depending on scope, our teams install heat tracing on piping systems, tanks and vessels, valves, pumps, instruments, hoses, loading systems and custom industrial equipment, including associated connection and temperature-sensing components.

At valves, flanges and pumps, installation must accommodate additional heat demand and later removal. Work follows the approved design and the instructions for the selected products. Deviations from the design are recorded before insulation conceals them.

Standards reference (checked 14 October 2026): IEC/IEEE 62395-2:2024 addresses system design, installation, maintenance and repair outside hazardous areas. DIN EN 62395-2:2014-12 remains the current German national edition. Record the agreed edition in the project documentation. IEC 60079-14:2024 addresses design, selection, installation and initial inspection of electrical Ex installations. Its German adoption is DIN EN IEC 60079-14:2026-02. It supplements general electrical-installation requirements.

Testing during installation

Electrical checks during installation help identify damage before insulation or other construction activities limit access to the heating circuits. The test and documentation scope is integrated into the project execution plan. Useful checkpoints can include testing after termination, before thermal insulation is closed and before handover. Recording results against each circuit and installation location also supports later maintenance and fault finding.

Standards reference (checked 14 October 2026): IEC 60364-6:2016, including its 2017 corrigendum, provides the international installation-verification reference. For initial verification in Germany, DIN VDE 0100-600:2017-06 applies. Product testing, installation verification and thermal operating evidence are documented separately.

Site sequence and handover

Deployment of our own installation teams includes coordination of work areas, access, material availability and permits with site management. Pipework and surface preparation, heater installation, agreed inspections and insulation closure must follow a coordinated sequence. Differences from the drawings are recorded and returned for engineering clarification. Handover identifies the installed heating circuits and includes the agreed documentation, giving the operator a usable record of the work.

We can offer thermal insulation with partner companies and coordinate it with the sequence of trades. We carry out cabling between our control panels and the power-feed and control boxes where cable routes are already available. Routing, connection points and responsibilities are agreed with the project team.