Your electric heat tracing project workflow
From consultation to final as-built documentation
A clear process helps everyone plan. Find out how we deliver your electric heat tracing project after the quotation, and which requirements affect production, delivery and installation. The seven steps and installation notes are based on our project workflow information sheet.
01
Quotation adjustments and consultation
Would you like to change or clarify the project? The contact named in your quotation is available to discuss your requirements.
Would you like to change or clarify the project? The contact named in your quotation is available to discuss your requirements.
03
Detailed planning and preliminary documentation
We prepare a detailed electric heat tracing concept and send the preliminary documentation for technical review and approval. We recommend forwarding it to the end …
We prepare a detailed electric heat tracing concept and send the preliminary documentation for technical review and approval. We recommend forwarding it to the end customer so that the execution meets their requirements.
Changes after production approval incur additional costs.
05
Delivery or installation
After production, we deliver the materials to the specified address or install them professionally on site in accordance with our installation conditions. Our specialist …
After production, we deliver the materials to the specified address or install them professionally on site in accordance with our installation conditions.
Our specialist staff work in accordance with the applicable technical regulations. The basis is an unhindered process with a single journey. Requirements and interfaces are described below the seven steps.
07
Final as-built documentation
At the end of the project, you receive the final as-built documentation describing the work performed.
At the end of the project, you receive the final as-built documentation describing the work performed.
Further information
Discuss your project with us
The contact named in your quotation can help with changes and technical questions. For a new project, share the application, site, temperatures, schedule and available …
The contact named in your quotation can help with changes and technical questions. For a new project, share the application, site, temperatures, schedule and available documents. Together we agree the engineering, supply, installation and any additional services.
Further information
References & projects
Explore our project reports for electric heat tracing and frost heave protection. View references & projects →
Explore our project reports for electric heat tracing and frost heave protection.
02
Order and order confirmation
We carefully review your order when it arrives and confirm it in writing within a few working days.
We carefully review your order when it arrives and confirm it in writing within a few working days.
04
Technical approval
Production and installation planning start only after your technical approval. The delivery period stated in the quotation starts at this point. If installation is …
Production and installation planning start only after your technical approval. The delivery period stated in the quotation starts at this point.
If installation is ordered, arrange a suitable installation period with our production management: Mr Tobias Spliethove, extension -05.
06
Invoice and proof of performance
After completion, we send you our invoice and the corresponding measurement and acceptance reports as proof of performance.
After completion, we send you our invoice and the corresponding measurement and acceptance reports as proof of performance.
Further information
Frequently asked questions
What must the client provide before installation? Our installation confirmation form must be signed and submitted at least three days before installation starts. All …
What must the client provide before installation?
Our installation confirmation form must be signed and submitted at least three days before installation starts. All installation locations and objects to be heated must be freely accessible and scaffolded for efficient work. We do not install from ladders. The client or an authorised person provides the safety briefing. Vessels must be dry, clean and free from grease.
Which services are normally excluded from the quotation?
Unless expressly agreed, the following are normally excluded and must be provided on site if required: insulation work, insulation pins and aluminium foil covering heated surfaces; scaffolding and lifting equipment; power and control cabling to junction boxes; fire barriers; removal of old insulation and heating; warning labels on insulation cladding after insulation work; testing of electric heat tracing after insulation work; warm commissioning of electric heat tracing; and switchgear.
When does additional installation work incur costs?
Additional journeys caused by on-site delays or inadequate prerequisites are charged separately. As stated in the information sheet, heating cable laid from a lifting vehicle or mobile scaffold incurs an additional charge of €10.90 per installed metre. Changes after production approval also incur additional costs.
Why must electric heat tracing and thermal insulation be coordinated?
The heating, insulation and the object to be heated must work together. Thermal bridges such as supports and valves can draw heat away from the process. We allow extra heating cable at these locations, but the losses can be too high for the heating alone to compensate, particularly at high temperatures. Components that draw heat from the process must therefore be insulated and thermally decoupled.
Further information